《供应链系统设计与管理》课程教学课件(讲稿,研究生)Lecture 10 Procurement and Outsourcing Strategies

Lecture10Procurement andOutsourcing Strategies(Chapter9)
Lecture 10 Procurement and Outsourcing Strategies (Chapter 9)

9.1.Introduction.What is outsourcing?. Outsourcing has been increased progressivelyover the yearsCompanies outsourced everything...* Fashion Industry (Nike) (all manufacturingoutsourced)* Electronics Industry* Cisco, Apple (over 7o% of components outsourced)Not Just Manufacturing but Product Design, Too
9.1 Introduction What is outsourcing? Outsourcing has been increased progressively over the years Companies outsourced everything. Fashion Industry (Nike) (all manufacturing outsourced) Electronics Industry Cisco, Apple (over 70% of components outsourced) Not Just Manufacturing but Product Design, Too

OutsourcingCaseWhere is the Boeing 787 Dreamliner Made?BOEINGAmerican companies make the front and back ofthe plane. The rest come from all over the world
Outsourcing Case Where is the Boeing 787 Dreamliner Made? American companies make the front and back of the plane. The rest come from all over the world

SelectedsystemsuppliersontheBoeing787DreamlinerFrance,UsJapan,FranceFrance.UsFrance,UsUK.France.UsIn-flightInside cockpit,Inside seating,InternalelectricalElectriccontrolsentertainmentsafetyavionicspowerandcomponentsBoeing787DreamlinerUSUSSelectedcomponentsandsystemsuppliersTail finCanadaKoreaItalyWingtipsAustraliaUKMovableFranceUStrailing edgeJapanSwedenAftfuselageItalyWingJapanCentrefuselageKoreaCanadaAustralia0ItalyEngineNacellesHorizontalstabilizerSwedenCargoaccessUSdoorsForward fuselageAircraftassemblersCurent-Airbus,JapanBoeingFuselagePotential -China,FranceUSUKRussia,JapanEntryFixedandLanding geardoorsLIKleadingEnginemovableedge

Comparison of Boeing'sstrategy for its737 and787 programsComponent737Program787ProgramSourcing strategyOutsource35-50%Outsourced70%Supplier relationshipTraditional supplierrelationshipStrategic partners with tier-1(purely contract based)suppliersSupplier responsibilitiesDeveloped and produced parts forDeveloped and produced sectionsBoeingforBoeingNumberof suppliersThousandsApproximately50 tier-1 strategicpartnersSupply contractsFixed-price contracts with delayRisk-sharing contractspenaltyAssemblyoperations30 days for Boeing to perform final3-day assembly of completeassemblysections
Comparison of Boeing's strategy for its 737 and 787 programs

9.2OutsourcingBenefitsand RisksBenefitsEconomiesofscaleRiskpoolingReduce capitalinvestmentFocus on core competencyIncreasedflexibility*openupopportunitiesforcompetitors*losetheirabilitytoOutsourcing Risksintroduce newdesigns1) Loss of Competitive Knowledge*preventinginnovations2)ConflictingObjectivesthat require cross-functionalteamwork
9.2 Outsourcing Benefits and Risks Benefits Economies of scale Risk pooling Reduce capital investment. Focus on core competency Increased flexibility Outsourcing Risks 1) Loss of Competitive Knowledge 2) Conflicting Objectives open up opportunities for competitors lose their ability to introduce new designs preventing innovations that require crossfunctional teamwork

IlsoutsourcingtoblameforBoeing's787Dreamlinerwoes?Boeingcontractedwithatoptierofabout 50 suppliers in all, handingthem complete control of the designof their piece of the plane, includingthe electrical system.BoeingcanshortenthedevelopmenttimeReducethedevelopmentcostAsBoeingoutsourcedmore,communicationandcoordinationbetweenBoeinganditssuppliersbecamecriticalformanagingtheprogressofthe787developmentprogram
Is outsourcing to blame for Boeing’s 787 Dreamliner woes? Boeing can shorten the development time Reduce the development cost. As Boeing outsourced more, communication and coordination between Boeing and its suppliers became critical for managing the progress of the 787 development program. Boeing contracted with a top tier of about 50 suppliers in all, handing them complete control of the design of their piece of the plane, including the electrical system

Frequentaccidents-Delay delivery time-Afireinelectrical system,failure inbrake equipment,fuelleakage...-Boeing787Dreamliner battery problemsBoeing787DreamlinerbatteryproblemsFrom Wikipedia, the free encyclopediaThetemplateinfoboxaviationisbeingconsideredfoIntheBoeing787Dreamliner'sfirstyearofservice,at leastfouraircraftsufferedfromelectricalsystemproblemsstemmingfromdeletion,its lithium-ionbatteries.Althoughteethingproblemsarecommonwithinthefirstyearofanewaircraftdesign's life,afteraBoeing787batteryproblemsnumberofincidentsincludinganelectricalfireaboardanAllNipponAinwavs787andasimilarfirefoundbymaintenanceworkersonalandedJapanAirlines787atBoston'sLoqanInternationalAirporttheUnitedStatesFederalAviationAdministration(FAA)orderedareviewintothedesignandmanufactureoftheBoeing.787Dreamlinerfollowingfiveincidentsinfivedaysinvolvingtheaircraft,mostlyinvolvedwithproblemswiththebatteriesandelectricalsystems.Thiswasfollowedwithafull groundingoftheentireBoeing787fleet,the firstsuchgroundingsincethatofMcDonnell DougiasDC-10in1979.l1Theplanehashadtwomajorbatterythermalrunawayeventsin52.o00flighthours,whichwassubstantially.belowthe10millionflight hours predicted by Boeing,and both werenot contained ina safe manner.[2]TheNationalTransportationSafetyBoardreleasedareportonDecember1.2014.andassignedblametoseveralgroups3]Gs Yuasa of Japan,for battery manufacturing methods that could introduce defects not caught by inspectionTheheavilyburnedbatteryfromJA829Jafteritsufferedthermal runaway.Boeing'sengineers,whofailedtoconsiderandtestforworst-casebatteryfailures.TheFederalAviationAdministration,whofailedtorecognizethepotentialhazardanddidnotrequirepropertestsaspartofMitscertificationprocess
Frequent accidents - Delay delivery time -A fire in electrical system, failure in brake equipment, fuel leakage . - Boeing 787 Dreamliner battery problems

A traditional supply chain for airplanemanufacturingSupplierSC structure forairplane mfgSupplierSupplierBoeingFinalCustomersBoeing's strategy for its 787AssemblySupplierprogramsSupplierSupplierRedesigned supply chain for the Dreamliner programTier3:SupplierTier3SupplierTier2:SystempartnerTier 1:Tier3:SupplierPre-integrationBoeing:Tier3:SupplierFinalAssemblyTier 2:Tier3:SupplierStructurabartnerCUSTOMERSTier3:Supplier
SC structure for airplane mfg. Boeing's strategy for its 787 programs

IsoutsourcingtoblameforBoeing's787Dreamlinerwoes?Very different on the 787 is the structure of the outsourcing- A top tier of about 5O suppliers. who control the design oftheirpieceoftheplane.- Those major partners had to make the upfront investment,share the risk and own their design. Each was responsible formanaging its own subcontractors."You only know what's going on with your tier 1 supplier.You have no visibility, no coordination, no real understanding ofhowallthepiecesfittogether."Canthemanagementteamtrace all theway down thetreeto every single supplier and unit? That's really difficult
Is outsourcing to blame for Boeing’s 787 Dreamliner woes? Very different on the 787 is the structure of the outsourcing. - A top tier of about 50 suppliers, who control the design of their piece of the plane. - Those major partners had to make the upfront investment, share the risk and own their design. Each was responsible for managing its own subcontractors. “You only know what’s going on with your tier 1 supplier. You have no visibility, no coordination, no real understanding of how all the pieces fit together. “Can the management team trace all the way down the tree to every single supplier and unit? That’s really difficult
按次数下载不扣除下载券;
注册用户24小时内重复下载只扣除一次;
顺序:VIP每日次数-->可用次数-->下载券;
- 《供应链系统设计与管理》课程教学课件(讲稿,研究生)供应链管理新趋势.pdf
- 《供应链系统设计与管理》课程教学课件(讲稿,研究生)Lecture 8 Strategic Alliances and VMI.pdf
- 《供应链系统设计与管理》课程教学资源(案例)2.1 某空调生产企业的供应链库存优化配置方法.pdf
- 《供应链系统设计与管理》课程教学资源(案例)3.1 Efes啤酒公司选址决策案例.pdf
- 《供应链系统设计与管理》课程教学资源(案例)1.1(b)WalMart SCM.pdf
- 《供应链系统设计与管理》课程教学资源(案例)1.1(a)WalMart SCM.pdf
- 《供应链系统设计与管理》课程教学资源(案例)5.1 巴里拉公司牛鞭效应案例.pdf
- 《供应链系统设计与管理》课程教学资源(案例)6.1 浙江省新华书店供应链整合案例.pdf
- 《供应链系统设计与管理》课程教学资源(案例)3.2 三环专用车公司分销中心选址案例.pdf
- 《供应链系统设计与管理》课程教学资源(案例)3.3 吉列公司配送网络改进.pdf
- 《供应链系统设计与管理》课程教学资源(案例)9.2 戴姆勒公司的电子采购战略.pdf
- 《供应链系统设计与管理》课程教学资源(案例)8.1 战略联盟 沃尔玛-宝洁VMI供应链合作案例.pdf
- 《供应链系统设计与管理》课程教学资源(案例)7.1 宝洁公司的仓储配送一体化战略.pdf
- 《供应链系统设计与管理》课程教学资源(案例)9.1 采购与外包风险案例- 波音787梦幻客机的问题.pdf
- 《供应链系统设计与管理》课程教学资源(案例)10.3 日本大地震暴露全球供应链风险.pdf
- 《供应链系统设计与管理》课程教学资源(案例)10.1 韩都衣舍的QR -供应链风险管理案例.pdf
- 《供应链系统设计与管理》课程教学资源(案例)10.2 outsourcing and its risk Boeing 787 Case.pdf
- 《供应链系统设计与管理》课程教学资源(案例)11.1 联想绿色供应链管理案例.pdf
- 《供应链系统设计与管理》课程授课教案(讲义,研究生)第2章 库存管理与风险分担.pdf
- 《供应链系统设计与管理》课程授课教案(讲义,研究生)第3章 供应链网络规划.pdf
- 《供应链系统设计与管理》课程教学课件(讲稿,研究生)Chapter 11 Coordinated Product and Supply Chain Design.pdf
- 《供应链系统设计与管理》课程教学课件(讲稿,研究生)Chapter 5 Bullwhip effect & the value of information.pdf
- 《供应链系统设计与管理》课程教学课件(讲稿,研究生)Chapter 2 风险分担与集中式库存控制 Risk Pooling & Centralized inventory control.pdf
- 《供应链系统设计与管理》课程教学课件(讲稿,研究生)Chapter 6 Supply Chain Integration What is integration.pdf
- 《供应链系统设计与管理》课程教学课件(讲稿,研究生)Chapter 4 Supply Contracts.pdf
- 《供应链系统设计与管理》课程教学课件(讲稿,研究生)供应链系统安全库存及其影响因素.pdf
- 《供应链系统设计与管理》课程教学课件(讲稿,研究生)最佳周期服务水平CSL的确定.pdf
- 《供应链系统设计与管理》课程教学课件(讲稿,研究生)周期检查补货策略下的安全库存.pdf
- 《供应链系统设计与管理》课程教学课件(讲稿,研究生)连续检查补货策略下的安全库存.pdf
- 《供应链系统设计与管理》课程教学课件(讲稿,研究生)Chapter 2 Inventory Management and Risk Pooling.pdf
- 《供应链系统设计与管理》课程教学课件(讲稿,研究生)Lecture 0 Overview 供应链系统设计与管理 Designing and Managing the Supply Chain.pdf
- 《供应链系统设计与管理》课程教学课件(讲稿,研究生)Lecture 1 Introduction to supply chain management(SCM).pdf
- 《供应链系统设计与管理》课程教学大纲 Designing and managing Supply Chain System(研究生).pdf
- 《供应链系统设计与管理》课程授课教案(讲义)Chapter 13(Lecture 12)Smart Pricing.pdf
- 《供应链系统设计与管理》课程授课教案(讲义)Chapter 08(Lecture 10)Strategic Alliances and VMI.pdf
- 《供应链系统设计与管理》课程授课教案(讲义)Chapter 09(Lecture 11)Procurement and Outsourcing Strategies.pdf
- 《供应链系统设计与管理》课程授课教案(讲义)Chapter 06(Lecture 9)Supply chain integration.pdf
- 《供应链系统设计与管理》课程授课教案(讲义)Chapter 05(Lecture 8)Bullwhip effect &the value of information.pdf
- 《供应链系统设计与管理》课程授课教案(讲义)Chapter 03(Lecture 6)SC network design and planning.pdf
- 《供应链系统设计与管理》课程授课教案(讲义)Chapter 02(Lecture 5)Risk Pooling(Centralized system).pdf