中国高校课件下载中心 》 教学资源 》 大学文库

《爆破工程 Blasting Engineering》课程教学课件(讲稿)Chapter 6 Presplit and smooth blasting technology method

文档信息
资源类别:文库
文档格式:PDF
文档页数:13
文件大小:908.25KB
团购合买:点击进入团购
内容简介
《爆破工程 Blasting Engineering》课程教学课件(讲稿)Chapter 6 Presplit and smooth blasting technology method
刷新页面文档预览

Chapter 6Presplit and SmoothBlastingMainContent6.4PracticesofPresplittingand6.1PresplittingBlastingSmoothBlasting(Omitted)6.2SmoothBlasting6.5Introductionof NewDirectionFractureBlasting Technology63Application ConditionofPresplittingand SmoothBlasting ((Omitted)2016/11/9第六章预裂爆破与光面爆破

2016/11/9 第六章 预裂爆破与光面爆破 2 Main Content Chapter 6 Presplit and Smooth Blasting 6.1 Presplitting Blasting 6.2 Smooth Blasting 6.3 Application Condition of Presplitting and Smooth Blasting(Omitted) 6.4 Practices of Presplitting and Smooth Blasting ( Omitted ) 6.5 Introduction of New Direction Fracture Blasting Technology :

6.1PresplittingBlastingThereare two same important questions faced by the blasting andexcavation in limited area:@Usingthe mosteffective methodsto fragment well the rockand throwing it if necessary in fixed area to reach the certainengineeringpurposes;②Reducing thedamages to surrounding rock and mostly keeptheirstrength and stability,meanwhile,screeningoffthesurroundingstosomeextentfrom groundvibrationin mainround.VIDIOPresplitting blastingThepresplitting blasting is drilling denseholes along the contour lineand thecracks atthe final contour are created by blasting priorto the drillingofthe rest oftheholes for the blasting pattern,using decouple chargeor lowpower explosive,which screens off damages from themainround tosurroundings,32016/11/9第六章预裂爆破与光面爆破

2016/11/9 第六章 预裂爆破与光面爆破 3 6.1 Presplitting Blasting Presplittin g blasting The presplitting blasting is drilling dense holes along the contour line, and the cracks at the final contour are created by blasting prior to the drilling of the rest of the holes for the blasting pattern, using decouple charge or low power explosive, which screens off damages from the main round to surroundings. There are two same important questions faced by the blasting and excavation in limited area: ① Using the most effective methods to fragment well the rock and throwing it if necessary in fixed area to reach the certain engineering purposes; ②Reducing the damages to surrounding rock and mostly keep their strength and stability, meanwhile, screening off the surroundings to some extent from ground vibration in main round

Mechanical Condition of CreatingPresplitCrack①Theradial pressure of explosiontoholewall lowerthan the dynamiclimitedcompressionstrength,whichnotcrushingtheholewallThe accompanying tangential tensile stress lowerthan the dynamic limitedtensile strength,whichnot createrandomcrackatholewall:O,Dt2016/11/9第六章预裂爆破与光面爆破

2016/11/9 第六章 预裂爆破与光面爆破 4 Mechanical Condition of Creating Presplit Crack  p  D p  t  D t ① The radial pressure of explosion to holewall lower than the dynamic limited compression strength, which not crushing the holewall: ② The accompanying tangential tensile stress lower than the dynamic limited tensile strength, which not create random crack at holewall: ③ The resultant tensile stress on line of holes centers higher than the dynamic limited tensile strength, then creating the cracks:  Rt  D t

Mechanism of Creating PresplitCracksA1)DecoupledchargeB2) Stress reinforcement on line of holes centers3)GuideholeforeachotherFiring the presplitholes simultaneously2016/11/9第六章预裂爆破与光面爆破

2016/11/9 第六章 预裂爆破与光面爆破 5 Mechanism of Creating Presplit Cracks A B 2) Stress reinforcement on line of holes centers C D 1)Decoupled charge 3) Guide hole for each other 4) Firing the presplit holes simultaneously

Calculation of Charge AmountThree methods:theoretical arithmetic,empirical formula andempiricalvalueEmpirical formulaTunnelingblasting:1.5~4;ProposeddecoupledDeep holeblasting in open blasting orlargecoefficient2~4。cavern :Tunneling blastingq' = 0.034[0压 J0.6 .[a]0.6Calculation ofcharge amountLeep hole blasting—q' = 0.042[0 μ J0-5 .[a]0.6where,qis linedensity,kg/m;O压 is limited compressionstrength,MPa;aisspacing,m62016/11/9第六章预裂爆破与光面爆破

2016/11/9 第六章 预裂爆破与光面爆破 6 Calculation of Charge Amount Three methods:theoretical arithmetic, empirical formula and empirical value Empirical formula Tunneling blasting: 1.5~4; Deep hole blasting in open blasting or large cavern : 2~4。 Proposed decoupled coefficient 0.6 0.6 q a    0.034[ ] [ ]  压 0.5 0.6 q a    0.042[ ] [ ]  压 Tunneling blasting Deep hole blasting Calculation of charge amount where,q is line density,kg/m;  压 is limited compression strength ,MPa; a is spacing,m

ConstructionofpresplittingblastingBDrillingStemmingCharge structureInterval time with 75-110msprior tothe mainroundwhen firing the presplit holes and main holes together2016/11/9第六章预裂爆破与光面爆破

2016/11/9 第六章 预裂爆破与光面爆破 7 Construction of presplitting blasting Drilling Charge structure Stemming A B C Interval time with 75~110ms prior to the main round when firing the presplit holes and main holes together

6.2 Smooth BlastingSmoothblastingThe smooth blasting is drilling dense holes along the contour line withdecouple charges or lowpower explosive,whichfiring after the main roundandformingwell contourprofile.VIDIO2016/11/9第六章预裂爆破与光面爆破

2016/11/9 第六章 预裂爆破与光面爆破 8 6.2 Smooth Blasting Smooth blasting The smooth blasting is drilling dense holes along the contour line with decouple charges or low power explosive, which firing after the main round and forming well contour profile

Differences between Presplittingand Smooth BlastingPresplittingblastingA The presplitting blasting firing prior to the main round;DifferentiatingBThepresplitting blastinghas onlyone free surface,sotheconstraintof rock islarger.SmoothblastingA The smooth blastinginitiatedafter the main blast;B The smooth blasting has twofree surface, so less constraint.2016/11/9第六章预裂爆破与光面爆破9

2016/11/9 第六章 预裂爆破与光面爆破 9 Differences between Presplitting and Smooth Blasting Differentiating Presplitting blasting Smooth blasting A The presplitting blasting firing prior to the main round; B The smooth blasting has two free surface, so less constraint. A The smooth blasting initiated after the main blast; B The presplitting blasting has only one free surface, so the constraint of rock is larger

Other Related of Smooth BlastingFirstSecondThirdMechanismSchemedesignConstruction第六章预裂爆破与光面爆破102016/11/9

2016/11/9 第六章 预裂爆破与光面爆破 10 Other Related of Smooth Blasting First Second Third Mechanism Scheme design Construction

6.5Directional Fracture Blasting1Notched-holeblasting(b)a22Shaped chargeblasting(c)(d)Notched hole and special-shaped drilling holePneumatic Down-the-ho(b)NotchedholeNotchedhole(a)3)Slotted charge(c)Special-shaped hole 1 Round head; 2 Pneuma(d)Guideholeblasting3Diamondsawblade:SHolewall2—Chargeinnerhole112016/11/9第六章预裂爆破与光面爆破

2016/11/9 第六章 预裂爆破与光面爆破 11 6.5 Directional Fracture Blasting 1) Notched-hole blasting 2) Shaped charge blasting 3) Slotted charge blasting Notched hole and special-shaped drilling hole (a) Notched hole (b) Notched hole (c) Guide hole (d) Special-shaped hole 1 — Holewall 2 — Charge inner hole Pneumatic Down-the-hole Groover 1 Round head;2 Pneumatic motor 3 Diamond saw blade ;4 Blasthole

共13页,试读已结束,阅读完整版请下载
刷新页面下载完整文档
VIP每日下载上限内不扣除下载券和下载次数;
按次数下载不扣除下载券;
注册用户24小时内重复下载只扣除一次;
顺序:VIP每日次数-->可用次数-->下载券;
相关文档