《航线进度计划》(英文版) lec1 Airline Schedule planning

1206J/1677J/ESD215J Airline Schedule Planning Cynthia barnhart spring 2003
1.206J/16.77J/ESD.215J Airline Schedule Planning Cynthia Barnhart Spring 2003

1.206J/16.77J/ESD. 215 Airline Schedule planning Outline Sign-up Sheet syllabus The Schedule planning process Flight Networks Time-line networks Connection networks Acyclic Networks Shortest paths on Acyclic Networks Multi-label Shortest Paths on Acyclic Networks 2/212021 Barnhart 1.206J/16.77J/ESD. 15J
2/21/2021 Barnhart 1.206J/16.77J/ESD.215J 2 1.206J/16.77J/ESD.215J Airline Schedule Planning Outline – Sign-up Sheet – Syllabus – The Schedule Planning Process – Flight Networks • Time-line networks • Connection networks – Acyclic Networks – Shortest Paths on Acyclic Networks – Multi-label Shortest Paths on Acyclic Networks

Fleet Planning Schedule Planning Route Development Schedule Development o Frequency Planning Timeta able develo ment o Fleet Assignment o Aircraft Rotations P Icing Crew Schedul Revenue Airport resource Management Management Sales and Operations Control 2/212021 Barnhart 1.206J/16.77J/ESD. 15J
2/21/2021 Barnhart 1.206J/16.77J/ESD.215J 3 Fleet Planning Schedule Planning - Route Development - Schedule Development o Frequency Planning o Timetable Development o Fleet Assignment o Aircraft Rotations Crew Scheduling Airport Resource Management Pricing Revenue Management Sales and Distribution Operations Control SHORT TERM LONG TERM TACTICAL STRATEGIC Time Horizon Types of Decision

Airline schedule planning Schedule design Select optimal set of fight legs in a schedule Fleet Assignment A flight specifies origin, destination, and departure time Aircraft routi Contribution revenue- Costs Assign crew(pilots and/or flight Crew Scheduling attendants) to flight legs 2/212021 Barnhart 1.206J/16.77J/ESD. 15J
2/21/2021 Barnhart 1.206J/16.77J/ESD.215J 4 Route individual aircraft honoring maintenance restrictions Assign aircraft types to flight legs such that contribution is maximized A flight specifies origin, destination, and departure time Contribution = Revenue - Costs Airline Schedule Planning Schedule Design Fleet Assignment Aircraft Routing Crew Scheduling Select optimal set of flight legs in a schedule Assign crew (pilots and/or flight attendants) to flight legs

Airline schedule planning Integration Schedule Design Fleet Assignment Aircraft routing Crew Scheduling 2/212021 Barnhart 1.206J/16.77J/ESD. 15J
2/21/2021 Barnhart 1.206J/16.77J/ESD.215J 5 Airline Schedule Planning: Integration Schedule Design Fleet Assignment Aircraft Routing Crew Scheduling

Airline schedule plannings Integration Schedule design Fleet Assignment Aircraft routing Crew Scheduling 2/212021 Barnhart 1.206J/16.77J/ESD. 15J
2/21/2021 Barnhart 1.206J/16.77J/ESD.215J 6 Airline Schedule Planning: Integration Schedule Design Fleet Assignment Aircraft Routing Crew Scheduling

Flight Schedule Minimum turn times =30 minutes Flight Origin Destin. Dep. Arrival Time Time A B 6:30 8:30 B 9:30 11:00 3 B 16:00 17:00 B A18:0020:00 2/212021 Barnhart 1.206J/16.77J/ESD. 15J
2/21/2021 Barnhart 1.206J/16.77J/ESD.215J 7 Flight Schedule • Minimum turn times = 30 minutes Flight No. Origin Destin. Dep. Time Arrival Time 1 A B 6:30 8:30 2 B C 9:30 11:00 3 C B 16:00 17:00 4 B A 18:00 20:00

Time-Space Flight Network Nodes Associated with each node jis a location 10and a time t( A Departure node i corresponds to a flight departure from location iat time An Arrival Node j corresponds to a flight arrival at location lGi at time t(i mmin turn time tl=arrival time of flight min turn -time flight ready time 2/212021 Barnhart 1.206J/16.77J/ES D 2 15J
2/21/2021 Barnhart 1.206J/16.77J/ESD.215J 8 Time-Space Flight Network Nodes • Associated with each node j is a location l(j) and a time t(j) • A Departure Node j corresponds to a flight departure from location l(j) at time t(j) • An Arrival Node j corresponds to a flight arrival at location l(j) at time t(j) – min_turn_time – t(j)= arrival time of flight + min_turn_time = flight ready time

Time-Space Flight Network Arcs Associated with each arc jk(with endnodes j and k) is an aircraft movement in space and time A Flight Arc ik represents a flight departing location lli at time tl and arriving at location l(k)at time t(k) gin turn time A Ground Arc or connection Arc ik represents an aircraft on the ground at location lg(l())from time tl) until time t(ke) 2/212021 Barnhart 1.206J/16.77J/ESD. 15J
2/21/2021 Barnhart 1.206J/16.77J/ESD.215J 9 Time-Space Flight Network Arcs • Associated with each arc jk (with endnodes j and k) is an aircraft movement in space and time • A Flight Arc jk represents a flight departing location l(j) at time t(j) and arriving at location l(k) at time t(k) – min_turn_time • A Ground Arc or Connection Arc jk represents an aircraft on the ground at location l(j) (= l(k)) from time t(j) until time t(k)

Time-Line Network Ground arcs City a City B City c City d 8:0012:0016:0020:00 8:0012:0016:002000 2/212021 Barnhart 1.206J/16.77J/ESD. 15J
2/21/2021 Barnhart 1.206J/16.77J/ESD.215J 10 Time-Line Network 8:00 12:00 16:00 20:00 8:00 12:00 16:00 20:00 City A City B City C City D • Ground arcs
按次数下载不扣除下载券;
注册用户24小时内重复下载只扣除一次;
顺序:VIP每日次数-->可用次数-->下载券;
- 麻省理工学院:《自制决策制造原则》英文版 Principles of Autonomy and Decision Making.pdf
- 麻省理工学院:《自制决策制造原则》英文版 Learning to Act optimally Reinforcement Learning.pdf
- 麻省理工学院:《自制决策制造原则》英文版 Planning to Maximize Reward: Markov Decision processes.pdf
- 麻省理工学院:《自制决策制造原则》英文版 Robot Localization using SIR.pdf
- 麻省理工学院:《自制决策制造原则》英文版 Probabilistic model.pdf
- 麻省理工学院:《自制决策制造原则》英文版 Integer programs solvable as LP.pdf
- 麻省理工学院:《自制决策制造原则》英文版 Courtesy or Eric Feron and Sommer.pdf
- 麻省理工学院:《自制决策制造原则》英文版 Courtesy of Sommer Gentry. Used with permission.pdf
- 麻省理工学院:《自制决策制造原则》英文版 Particle filters for Fun and profit.pdf
- 麻省理工学院:《自制决策制造原则》英文版 Conflict-directed Diagnosis.pdf
- 麻省理工学院:《自制决策制造原则》英文版 Roadmap path planning.pdf
- 麻省理工学院:《自制决策制造原则》英文版 Model-based Diagnosis.pdf
- 麻省理工学院:《自制决策制造原则》英文版 Shortest path and Informed Search.pdf
- 麻省理工学院:《自制决策制造原则》英文版 Programming SATPlan.pdf
- 麻省理工学院:《自制决策制造原则》英文版 Solving Constraint Satisfaction Problems Forward Checking.pdf
- 麻省理工学院:《自制决策制造原则》英文版 Solving constraint satisfaction Problems.pdf
- 麻省理工学院:《自制决策制造原则》英文版 Partial Order Planning and execution.pdf
- 麻省理工学院:《自制决策制造原则》英文版 Propositional Logic.pdf
- 麻省理工学院:《自制决策制造原则》英文版 Graph-based Planning.pdf
- 麻省理工学院:《自制决策制造原则》英文版 Even more scheme.pdf
- 《航线进度计划》(英文版) lec4 Airline Schedule planning.ppt
- 《航线进度计划》(英文版) lec3 Airline Schedule planning.ppt
- 《航线进度计划》(英文版) lec2 multi-commodity Flows.ppt
- 《航线进度计划》(英文版) lec7 crew scheduling.ppt
- 《航线进度计划》(英文版) lec6 fleet assignment.ppt
- 《航线进度计划》(英文版) lec5 passenger mix.ppt
- 《航线进度计划》(英文版) lec11 aop1.pdf
- 《航线进度计划》(英文版) lec12 aop2.pdf
- 《航线进度计划》(英文版) lec10 schedule design.ppt
- 《航线进度计划》(英文版) lec9 crew pairing and aircraft routing.ppt
- 《航线进度计划》(英文版) lec8 aircraft maintenance routing.ppt
- 《航线进度计划》(英文版) lec13 aop3.pdf
- 《航线进度计划》(英文版) lec14 Shan Lan Robust scheduling.ppt
- 《直升机涡环状态》讲义.ppt
- 美国麻省理工大学:《Thermal Energy》(热能) 01 contents cvr.pdf
- 美国麻省理工大学:《Thermal Energy》(热能) 05 part1c.pdf
- 美国麻省理工大学:《Thermal Energy》(热能) 04 part1b.pdf
- 美国麻省理工大学:《Thermal Energy》(热能) 03 part1a to CMS.pdf
- 美国麻省理工大学:《Thermal Energy》(热能) 02 part0.pdf
- 美国麻省理工大学:《Thermal Energy》(热能) 06 part1d.pdf