中国高校课件下载中心 》 教学资源 》 大学文库

《航线进度计划》(英文版) lec7 crew scheduling

文档信息
资源类别:文库
文档格式:PPT
文档页数:58
文件大小:203.5KB
团购合买:点击进入团购
内容简介
1.206J/16.77J/FSD215J The Crew Scheduling problem Outline Problem definition Sequential Solution Approach Crew pairing optimization model Branch-and-Price solution Branching strategies
刷新页面文档预览

1206J/1677J/ESD215J Airline Schedule Planning Cynthia barnhart spring 2003

1.206J/16.77J/ESD.215J Airline Schedule Planning Cynthia Barnhart Spring 2003

1206/16.77J/ESD215J The Crew Scheduling problem Outline Problem definition Sequential Solution Approach Crew Pairing optimization model Branch-and-Price solution Branching strategies 2/212021 Barnhart 1.206J/16.77J/ESD. 15J

2/21/2021 Barnhart 1.206J/16.77J/ESD.215J 2 1.206J/16.77J/ESD.215J The Crew Scheduling Problem • Outline – Problem Definition – Sequential Solution Approach – Crew Pairing Optimization Model – Branch-and-Price Solution • Branching strategies

Why Crew scheduling? secone nd largest operating expense (after fuel) OR Success story Complex problems with many remaining opportunities a case study for techniques to solve large Ip 2/212021 Barnhart 1.206J/16.77J/ES D 2 15J

2/21/2021 Barnhart 1.206J/16.77J/ESD.215J 3 Why Crew Scheduling? • Second largest operating expense (after fuel) • OR success story • Complex problems with many remaining opportunities • A case study for techniques to solve large IPs

Airline schedule planning Schedule Design Fleet Assignment Aircraft routing Crew Scheduling 2/212021 Barnhart 1.206J/16.77J/ESD. 15J

2/21/2021 Barnhart 1.206J/16.77J/ESD.215J 4 Airline Schedule Planning Schedule Design Fleet Assignment Aircraft Routing Crew Scheduling

The Crew Scheduling problem Assign crews to cover all flights for a given fleet type Minimize cost - Time paid for flying penalty pay Side constraints balance Robustness 2/212021 Barnhart 1.206J/16.77J/ESD. 15J

2/21/2021 Barnhart 1.206J/16.77J/ESD.215J 5 The Crew Scheduling Problem • Assign crews to cover all flights for a given fleet type • Minimize cost – Time paid for flying – “Penalty” pay • Side constraints – Balance – Robustness

Network flow problem? Complex feasibility rules Non-linear objective function 2/212021 Barnhart 1.206J/16.77J/ES D 2 15J

2/21/2021 Barnhart 1.206J/16.77J/ESD.215J 6 Network Flow Problem? • Complex feasibility rules •Non-linear objective function

Building blocks To Do une 10:00 Flight Duty Pairing Schedule 2/212021 Barnhart 1.206J/16.77J/ESD. 15J

2/21/2021 Barnhart 1.206J/16.77J/ESD.215J 7 Building Blocks To Do 9:00 10:00 11:00 12:00 1:00 2:00 3:00 Duty June Flight Pairing Schedule

Duty Periods Definition a duty period is a day-long sequence of consecutive flights that can be assigned to a single cren, to be followed by a period of rest 2/212021 Barnhart 1.206J/16.77J/ESD. 15J

2/21/2021 Barnhart 1.206J/16.77J/ESD.215J 8 Duty Periods Definition: A duty period is a day-long sequence of consecutive flights that can be assigned to a single crew, to be followed by a period of rest

Duty rules Rules Flights are sequential in space/ time Maximum flying time Minimum idle/ sit/connect time Maximum idle/sit/connect time Maximum duty time 2/212021 Barnhart 1.206J/16.77J/ESD. 15J

2/21/2021 Barnhart 1.206J/16.77J/ESD.215J 9 Duty Rules Rules: • Flights are sequential in space/time • Maximum flying time • Minimum idle/sit/connect time • Maximum idle/sit/connect time • Maximum duty time

Duty Cost Function Maximum of Total flying time fa total duty time Minimum guaranteed duty pay Primarily compensates for flying time, but also compensates for undesirable" schedules 2/212021 Barnhart 1.206J/16.77J/ESD. 15J

2/21/2021 Barnhart 1.206J/16.77J/ESD.215J 10 Duty Cost Function • Maximum of: – Total flying time – f d * total duty time – Minimum guaranteed duty pay • Primarily compensates for flying time, but also compensates for “undesirable” schedules

刷新页面下载完整文档
VIP每日下载上限内不扣除下载券和下载次数;
按次数下载不扣除下载券;
注册用户24小时内重复下载只扣除一次;
顺序:VIP每日次数-->可用次数-->下载券;
相关文档