《面向对象软件工程》课程PPT教学课件(英文版)Chapter 11:Managing the Software Process

object-Oriented Software Engineering Practical Software development using uml and Java Chapter 11: Managing the Software Process www.oseng.com
Object-Oriented Software Engineering Practical Software Development using UML and Java Chapter 11: Managing the Software Process

11. 1 What is project management? Proiect management encompasses all the activities needed to plan and execute a project Deciding what needs to be done Estimating costs Ensuring there are suitable people to undertake the project Defining responsibilities Scheduling Making arrangements for the work continued www.oseng.com O Lethbridge/Laganiere 2001 Chapter Il: Managing the Software Process
© Lethbridge/Laganière 2001 Chapter 11: Managing the Software Process 2 11.1 What is Project Management? Project management encompasses all the activities needed to plan and execute a project: • Deciding what needs to be done • Estimating costs • Ensuring there are suitable people to undertake the project • Defining responsibilities • Scheduling • Making arrangements for the work • continued

What is project management? Directing Being a technical leader Reviewing and approving decisions made by others Building morale and supporting staff Monitoring and controlling Co-ordinating the work with managers of other projects Reporting Continually striving to improve the process www.oseng.com O Lethbridge/Laganiere 2001 Chapter Il: Managing the Software Process
© Lethbridge/Laganière 2001 Chapter 11: Managing the Software Process 3 What is Project Management? • Directing • Being a technical leader • Reviewing and approving decisions made by others • Building morale and supporting staff • Monitoring and controlling • Co-ordinating the work with managers of other projects • Reporting • Continually striving to improve the process

11.2 Software Process models Software process models are general approaches for organizing a project into activities. Help the project manager and his or her team to decide What work should be done -In what sequence to perform the work The models should be seen as aids to thinking, not rigid prescriptions of the way to do things Each project ends up with its own unique plan www.oseng.com O Lethbridge/Laganiere 2001 Chapter Il: Managing the Software Process 4
© Lethbridge/Laganière 2001 Chapter 11: Managing the Software Process 4 11.2 Software Process Models Software process models are general approaches for organizing a project into activities. • Help the project manager and his or her team to decide: —What work should be done; —In what sequence to perform the work. • The models should be seen as aids to thinking, not rigid prescriptions of the way to do things. • Each project ends up with its own unique plan

The opportunistic approach First Modify Think of ldea Prototy pe Until for Satis fied Improvement www.oseng.com O Lethbridge/Laganiere 2001 Chapter Il: Managing the Software Process
© Lethbridge/Laganière 2001 Chapter 11: Managing the Software Process 5 The opportunistic approach Think of Idea for Improvement Modify Until Satisfied First Prototype

The opportunistic approach is what occurs when an organization does not follow good engineering practices. It does not acknowledge the importance of working out the requirements and the design before implementing a system The design of software deteriorates faster if it is not well designe Since there are no plans, there is nothing to aim towards There is no explicit recognition of the need for ystematic testing and other forms of quality assurance The above problems make the cost of developing and maintaining software very high www.oseng.com O Lethbridge/Laganiere 2001 Chapter Il: Managing the Software Process 6
© Lethbridge/Laganière 2001 Chapter 11: Managing the Software Process 6 The opportunistic approach … is what occurs when an organization does not follow good engineering practices. • It does not acknowledge the importance of working out the requirements and the design before implementing a system. • The design of software deteriorates faster if it is not well designed. • Since there are no plans, there is nothing to aim towards. • There is no explicit recognition of the need for systematic testing and other forms of quality assurance. • The above problems make the cost of developing and maintaining software very high

The waterfall model Requirements athering ar Definition 图, Specification g Implementation Integration and Deployment Maintenance www.oseng.com O Lethbridge/Laganiere 2001 Chapter Il: Managing the Software Process
© Lethbridge/Laganière 2001 Chapter 11: Managing the Software Process 7 The waterfall model V & V Requirements Gathering and Definition V & V Specification V & V Design V & V Implementation V & V Maintenance V & V Integration and Deployment

The waterfall model The classic way of looking at S.E. that accounts for the importance of requirements, design and quality assurance. The model suggests that software engineers should work in a series of stages Before completing each stage, they should perform quality assurance(verification and validation) The waterfall model also recognizes, to a limited extent that you sometimes have to step back to earlier stages www.oseng.com O Lethbridge/Laganiere 2001 Chapter Il: Managing the Software Process 8
© Lethbridge/Laganière 2001 Chapter 11: Managing the Software Process 8 The waterfall model The classic way of looking at S.E. that accounts for the importance of requirements, design and quality assurance. • The model suggests that software engineers should work in a series of stages. • Before completing each stage, they should perform quality assurance (verification and validation). • The waterfall model also recognizes, to a limited extent, that you sometimes have to step back to earlier stages

Limitations of the waterfall model The model implies that you should attempt to complete a given stage before moving on to the next stage -Does not account for the fact that requirements constantly change - lt also means that customers can not use anything until the entire system is complete The model makes no allowances for prototyping It implies that you can get the requirements right by simply writing them down and reviewing them The model implies that once the product is finished everything else is maintenance www.oseng.com O Lethbridge/Laganiere 2001 Chapter Il: Managing the Software Process
© Lethbridge/Laganière 2001 Chapter 11: Managing the Software Process 9 Limitations of the waterfall model • The model implies that you should attempt to complete a given stage before moving on to the next stage —Does not account for the fact that requirements constantly change. —It also means that customers can not use anything until the entire system is complete. • The model makes no allowances for prototyping. • It implies that you can get the requirements right by simply writing them down and reviewing them. • The model implies that once the product is finished, everything else is maintenance

The phased-release model Phase 1 Gathering and Definition Implementation Specification Integration and Planning & Phase 2 Implementation Integration and Depl oyme www.oseng.com O Lethbridge/Laganiere 2001 Chapter Il: Managing the Software Process
© Lethbridge/Laganière 2001 Chapter 11: Managing the Software Process 10 The phased-release model V & V Requirements Gathering and Definition V & V Specification V & V Design V & V Implementation V & V Planning Phase 1 V & V Design V & V Implementation Phase 2 etc ... V & V Integration and Deployment V & V Integration and Deployment
按次数下载不扣除下载券;
注册用户24小时内重复下载只扣除一次;
顺序:VIP每日次数-->可用次数-->下载券;
- 《面向对象软件工程》课程PPT教学课件(英文版)Chapter 10:Testing and Inspecting to Ensure High Quality.ppt
- 《面向对象软件工程》课程PPT教学课件(英文版)Chapter 9:Architecting and Designing Softwarech09.ppt
- 《面向对象软件工程》课程PPT教学课件(英文版)Chapter 8:Modelling Interactions and Behaviour.ppt
- 《面向对象软件工程》课程PPT教学课件(英文版)Chapter 1. Software and Software Engineering.pdf
- 《面向对象软件工程》课程PPT教学课件(英文版)Chapter 6:Using Design Patterns.ppt
- 《面向对象软件工程》课程PPT教学课件(英文版)Chapter 5:Modelling with Classes.ppt
- 《面向对象软件工程》课程PPT教学课件(英文版)Chapter 4:Developing Requirements.ppt
- 《面向对象软件工程》课程PPT教学课件(英文版)Chapter 3:Basing Software Development on Reusable Technology.ppt
- 《面向对象软件工程》课程PPT教学课件(英文版)Chapter 2:Review of Object Orientation.ppt
- 《面向对象软件工程》课程PPT教学课件(英文版)Chapter 1:Software and Software Engineering.ppt
- 《面向对象软件工程》课程PPT教学课件(英文版)Chapter 7:Focusing on Users and Their Tasks.ppt
- 徐州工程学院:《电子商务概论》课程教学资源(PPT课件讲稿)总目录.ppt
- 徐州工程学院:《电子商务概论》课程教学资源(PPT课件讲稿)导论(主讲:武长柱).ppt
- 徐州工程学院:《电子商务概论》课程教学资源(PPT课件讲稿)复习.ppt
- 徐州工程学院:《电子商务概论》课程教学资源(PPT课件讲稿)chp14电子商务发展中的法律法规.ppt
- 徐州工程学院:《电子商务概论》课程教学资源(PPT课件讲稿)chp9 电子商务开发技术.ppt
- 徐州工程学院:《电子商务概论》课程教学资源(PPT课件讲稿)chp8 电子政务.ppt
- 徐州工程学院:《电子商务概论》课程教学资源(PPT课件讲稿)chp7 物流与供应链管理.ppt
- 徐州工程学院:《电子商务概论》课程教学资源(PPT课件讲稿)chp6 客户关系管理.ppt
- 徐州工程学院:《电子商务概论》课程教学资源(PPT课件讲稿)chp5 网络银行与支付.ppt
- 《PPT应用与计算机安全》讲义.ppt
- 《新标准中文版Photoshop7基础培训教程》教学资源(PPT课件讲稿)第10章 滤镜(上).ppt
- 《新标准中文版Photoshop7基础培训教程》教学资源(PPT课件讲稿)第11章 滤镜(下).ppt
- 《新标准中文版Photoshop7基础培训教程》教学资源(PPT课件讲稿)第1章 初识Photoshop 7.ppt
- 《新标准中文版Photoshop7基础培训教程》教学资源(PPT课件讲稿)第2章 基础工具.ppt
- 《新标准中文版Photoshop7基础培训教程》教学资源(PPT课件讲稿)第3章 绘图工具.ppt
- 《新标准中文版Photoshop7基础培训教程》教学资源(PPT课件讲稿)第4章 油漆桶和渐变工具.ppt
- 《新标准中文版Photoshop7基础培训教程》教学资源(PPT课件讲稿)第5章 路径及形状处理工具.ppt
- 《新标准中文版Photoshop7基础培训教程》教学资源(PPT课件讲稿)第6章 文字工具.ppt
- 《新标准中文版Photoshop7基础培训教程》教学资源(PPT课件讲稿)第7章 其他工具.ppt
- 《新标准中文版Photoshop7基础培训教程》教学资源(PPT课件讲稿)第8章 图层与蒙版第8章.ppt
- 《新标准中文版Photoshop7基础培训教程》教学资源(PPT课件讲稿)第9章 通道的应用.ppt
- 《数字图象处理》第一章 Windows 位图和调色板.doc
- 《数字图象处理》第十章 图象处理编程工具及简单的多媒体编程.doc
- 《数字图象处理》第二章 图象的几何变换.doc
- 《数字图象处理》第三章 图象的平滑(去噪声)、锐化.doc
- 《数字图象处理》第四章 图象的半影调和抖动技术.doc
- 《数字图象处理》第五章 直方图修正和彩色变换.doc
- 《数字图象处理》第六章 腐蚀,膨胀,细化算法.doc
- 《数字图象处理》第七章 边沿检测与提取,轮廓跟踪.doc