上海交通大学:《现代机械工程图学》教学资源_教学课件_Lec10_Statistics

ME250:Statistics Probability ME 250:Design Manufacturing I School of Mechanical Engineering Shanghai Jiao Tong University 1
Shanghai Jiao Tong University 1 ME250: Statistics & Probability ME 250: Design & Manufacturing I School of Mechanical Engineering

Outline ■Introduction Tolerances ■Reliability Statistical Process Control ■Regression ■ Summary Shanghai Jiao Tong University 2
Shanghai Jiao Tong University 2 Outline n Introduction n Tolerances n Reliability n Statistical Process Control n Regression n Summary

Introduction Uncertainty in Design Manufacturing Learning Objectives Understand the elementary aspects of statistics and probability. How to represent data. Discrete and continuous distributions. The normal distribution and how to use tables of the cumulative distribution. Probability of single and multiple events. Obtaining trends from noisy data by regression. Applications in statistical process control and geometric dimensioning and tolerances. Taylor's tool life equation and how to use it. Shanghai Jiao Tong University 3
Shanghai Jiao Tong University 3 Introduction n Uncertainty in Design & Manufacturing n Learning Objectives n Understand the elementary aspects of statistics and probability. n How to represent data. n Discrete and continuous distributions. n The normal distribution and how to use tables of the cumulative distribution. n Probability of single and multiple events. n Obtaining trends from noisy data by regression. n Applications in statistical process control and geometric dimensioning and tolerances. n Taylor’s tool life equation and how to use it

Example 1 Suppose a company produces 1000 engines per year and 5 engines fail on average per year.The failures can be eliminated by a 100%inspection program.If it costs $10,000 to replace an engine but $100 to inspect each one,then the costs are: ■Inspect:1000*$100=$100,000 ■Replace:5*$10,000=$50,000 Obviously,it is cheaper not to inspect.If 10 or more engines fail, then the inspection program is cheaper. Therefore,it is very important for the company to maintain good statistical data on its manufacturing process. Shanghai Jiao Tong University 4
Shanghai Jiao Tong University 4 Example 1 n Suppose a company produces 1000 engines per year and 5 engines fail on average per year. The failures can be eliminated by a 100% inspection program. If it costs $10,000 to replace an engine but $100 to inspect each one, then the costs are: n Inspect: 1000 * $100 = $100,000 n Replace: 5 * $10,000 = $50,000 n Obviously, it is cheaper not to inspect. If 10 or more engines fail, then the inspection program is cheaper. n Therefore, it is very important for the company to maintain good statistical data on its manufacturing process

Tolerances Tolerances refer to how close a dimension or a surface finish of a manufactured part is to the desired or "nominal"dimension. The explicit specification of tolerances is critical for determining the manufacturing process(es)required to make a part and therefore its final cost. If the surface finish is not important,it may be possible to use cheaper or faster process than if the surface finish is critical. Shanghai Jiao Tong University 5
Shanghai Jiao Tong University 5 Tolerances n Tolerances refer to how close a dimension or a surface finish of a manufactured part is to the desired or “nominal” dimension. n The explicit specification of tolerances is critical for determining the manufacturing process(es) required to make a part and therefore its final cost. n If the surface finish is not important, it may be possible to use cheaper or faster process than if the surface finish is critical

Reliability Reliability is the likelihood that an object will perform its function or a process will yield satisfactory results. Often,the reliability of system must be predicted from an estimate of the reliability of its components. Shanghai Jiao Tong University 6
Shanghai Jiao Tong University 6 Reliability n Reliability is the likelihood that an object will perform its function or a process will yield satisfactory results. n Often, the reliability of system must be predicted from an estimate of the reliability of its components

Statistical Process Control Statistical Process Control is used to monitor processes in a way such that normal variability of the operation is accounted for, but long term degradation is observed. The process is sampled at given intervals and the statistics of the samples compared.The cost of the inspection must be balanced versus the dangers of either missing a change in the process or misinterpreting a statistical fluctuation for a change in the process. Shanghai Jiao Tong University 7
Shanghai Jiao Tong University 7 Statistical Process Control n Statistical Process Control is used to monitor processes in a way such that normal variability of the operation is accounted for, but long term degradation is observed. n The process is sampled at given intervals and the statistics of the samples compared. The cost of the inspection must be balanced versus the dangers of either missing a change in the process or misinterpreting a statistical fluctuation for a change in the process

Regression Regression allows us to determine a relationship between two or more variables,even when there is uncertainly in the measurements and the relationship may not be immediately obvious. We will use regression to establish the Taylor's Tool Life Equation. Shanghai Jiao Tong University 8
Shanghai Jiao Tong University 8 Regression n Regression allows us to determine a relationship between two or more variables, even when there is uncertainly in the measurements and the relationship may not be immediately obvious. n We will use regression to establish the Taylor’s Tool Life Equation

Terminology If the parameters of a model of a system or a process are known,given,or established from past history,then we have a probability problem and we can deduce the behavior of the system from the model.However,if the parameters are unknown and have to be estimated from the available data,then we have a statistical problem. Shanghai Jiao Tong University 9
Shanghai Jiao Tong University 9 Terminology n If the parameters of a model of a system or a process are known, given, or established from past history, then we have a probability problem and we can deduce the behavior of the system from the model. However, if the parameters are unknown and have to be estimated from the available data, then we have a statistical problem

Representing Statistical Data ■Histogram Group the data into bins or intervals and show the size of each bin (interval)graphically. Cumulative distribution Show graphically how much of the data is below a given value Shanghai Jiao Tong University 10
Shanghai Jiao Tong University 10 Representing Statistical Data n Histogram Group n the data into bins or intervals and show the size of each bin (interval) graphically. n Cumulative distribution n Show graphically how much of the data is below a given value
按次数下载不扣除下载券;
注册用户24小时内重复下载只扣除一次;
顺序:VIP每日次数-->可用次数-->下载券;
- 上海交通大学:《现代机械工程图学》教学资源_教学课件_Lec09_machining.ppt
- 上海交通大学:《现代机械工程图学》教学资源_教学课件_Lec08_QFD.ppt
- 上海交通大学:《现代机械工程图学》教学资源_教学课件_Lec07_Design.ppt
- 上海交通大学:《现代机械工程图学》教学资源_教学课件_Lec06_Project.ppt
- 上海交通大学:《现代机械工程图学》教学资源_教学课件_Lec05_GD&T2.ppt
- 上海交通大学:《现代机械工程图学》教学资源_教学课件_Lec04_GD&T1.ppt
- 上海交通大学:《现代机械工程图学》教学资源_教学课件_Lec03_Engdrawing2.ppt
- 上海交通大学:《现代机械工程图学》教学资源_教学课件_设计过程——设计制造基础.pdf
- 上海交通大学:《现代机械工程图学》教学资源_教学课件_Lec02_Engdrawing1.ppt
- 上海交通大学:《现代机械工程图学》教学资源_教学课件_设计制造基础介绍.pdf
- 上海交通大学:《现代机械工程图学》教学资源_教学课件_Lec01_introduction.ppt
- 上海交通大学:《现代机械工程图学》教学资源(实践课件)07_UG:Free Form Feature ME 250:Design & Manufacturing I.ppt
- 上海交通大学:《现代机械工程图学》教学资源(实践课件)06_UG:Free Form Feature ME 250:Design & Manufacturing I.ppt
- 上海交通大学:《现代机械工程图学》教学资源(实践课件)06_UG:Drafting ME 250:Design & Manufacturing I.ppt
- 上海交通大学:《现代机械工程图学》教学资源(实践课件)05_UG:Drafting ME 250:Design & Manufacturing I.ppt
- 上海交通大学:《现代机械工程图学》教学资源(实践课件)04_UG:Modeling.ppt
- 上海交通大学:《现代机械工程图学》教学资源(实践课件)02_sketch UG:Sketch.ppt
- 上海交通大学:《现代机械工程图学》教学资源(实践课件)01_introduction Labs(part I):CAD.ppt
- 上海交通大学:《创新思维与现代设计》教学资源_课程讲义_2011创新设计_第1讲 创新与设计.pdf
- 上海交通大学:《创新思维与现代设计》教学资源_课程讲义_2011_创新设计_第4讲.pdf
- 上海交通大学:《现代机械工程图学》教学资源_教学课件_Lec13_metal.ppt
- 上海交通大学:《现代机械工程图学》教学资源_教学课件_Lec14_polymers.ppt
- 上海交通大学:《现代机械工程图学》教学资源_课程设计_课程设计1_cupholder01.ppt
- 上海交通大学:《现代机械工程图学》教学资源_课程设计_课程设计2_2009Project_ME250.ppt
- 上海交通大学:《现代机械工程图学》教学资源_课程设计_课程设计2_2016ConceptCar Project Slide 08.ppt
- 上海交通大学:《现代机械工程图学》教学资源_附加材料_FINAL REPORT FORMATTING REQUIREMENTS.pdf
- 上海交通大学:《形象思维与工程语言》教学资源_Lec01_01_VT_Course_Intro.pdf
- 上海交通大学:《形象思维与工程语言》教学资源_Lec01_02_VT_Visual Thinking(1).pdf
- 上海交通大学:《形象思维与工程语言》教学资源_Lec02_VT_Visual Thinking(2).pdf
- 上海交通大学:《形象思维与工程语言》教学资源_Lec03_01_工程设计与团队合作.pdf
- 上海交通大学:《形象思维与工程语言》教学资源_Lec04_QFD01.pdf
- 上海交通大学:《形象思维与工程语言》教学资源_Lec05_QFD02.pdf
- 上海交通大学:《形象思维与工程语言》教学资源_Lec06_课程设计.pdf
- 上海交通大学:《形象思维与工程语言》教学资源_Lec07_01_Eng Lang_Intro.pdf
- 上海交通大学:《形象思维与工程语言》教学资源_Lec07_02_Eng Lang_01基本立体投影.pdf
- 上海交通大学:《形象思维与工程语言》教学资源_Lec08_01_Eng Lang_02组合体视图.pdf
- 上海交通大学:《形象思维与工程语言》教学资源_Lec09_01_Eng Lang_04草图.pdf
- 上海交通大学:《形象思维与工程语言》教学资源_Lec09_02_Eng Lang_05轴测图.pdf
- 上海交通大学:《形象思维与工程语言》教学资源_Lec10_01_CG_01基础.pdf
- 上海交通大学:《形象思维与工程语言》教学资源_Lec10_02_CG_02-AUTOCAD.pdf