中国高校课件下载中心 》 教学资源 》 大学文库

《物流英语》课程教学课件(PPT讲稿)Unit 05 Just-in-time and lean systems

文档信息
资源类别:文库
文档格式:PPT
文档页数:25
文件大小:589KB
团购合买:点击进入团购
内容简介
《物流英语》课程教学课件(PPT讲稿)Unit 05 Just-in-time and lean systems
刷新页面文档预览

Just-in-time andlean systemsJust-in-time (JIT) is one of the widelyadopted and practiced philosophy as well astechniqueIt is based on the simple idea that whereverpossible no activity should take place in asystem until there is a need for it

Just-in-time and lean systems  Just-in-time (JIT) is one of the widely adopted and practiced philosophy as well as technique.  It is based on the simple idea that wherever possible no activity should take place in a system until there is a need for it

Toyotaproduction system·In the mid 1950s, Toyota management studied mass productionin the US and found:.The room of cutting down costs outweighed the benefitsbroughtbyscale·Enterpriseswerenotaccustomed tomarket changes,noremployees'creativityencouraged·JITenabledJapantotaptheautomobilemarket intheUS in1980s

Toyota production system •In the mid 1950s, Toyota management studied mass production in the US and found: •The room of cutting down costs outweighed the benefits brought by scale •Enterprises were not accustomed to market changes, nor employees’ creativity encouraged. •JIT enabled Japan to tap the automobile market in the US in 1980s

The Japanese Philosophy? Waste is anything that does not add valuefrom the customer point of view Storage, inspection, delay, waiting in queues.and defective products do not add value andare 100%waste

The Japanese Philosophy  Waste is anything that does not add value from the customer point of view  Storage, inspection, delay, waiting in queues, and defective products do not add value and are 100% waste

CustomerPullOn Time DeliverFIFORotateStockQualityCostGROCERIES-Requirement-FreshR-Ayailable-Brand-PriceSizeSupplyDemandJ.I.T-RequirementsCommunicationsSpecifications-ExpectationsCapacity-Timing

PullSystemPull SignalsPullProcessDefinition:A method of controlling theflowofresourcesbyWASTEreplacing onlywhat hasbeenconsumedMaterialAtManpowerOperator

Pull system vs push systemDemandCustomersFinished products“pull"FactoryFinished productswarehouseWork-in-progressFactoryProductComponentssuppliers“push

Pull system vs push system Demand “pull” Product “push” Customers suppliers Factory warehouse Factory Components Work-in-progress Finished products Finished products

Pull systemApull system uses signals to requestproduction and delivery from upstreamstationsUpstream stations onlyproducewhensignaled? By pulling material in small lots, inventorycushions are removed, exposing problemsand emphasizing continual improvement

Pull system  A pull system uses signals to request production and delivery from upstream stations  Upstream stations only produce when signaled  By pulling material in small lots, inventory cushions are removed, exposing problems and emphasizing continual improvement

Advantages of KanbanAllow only limited amount of faulty ordelayed materialProblems are immediately evidentPuts downward pressure on bad aspects ofinventoryStandardized containers reduce weight.disposal costs, wasted space, and labor

Advantages of Kanban Allow only limited amount of faulty or delayed material Problems are immediately evident Puts downward pressure on bad aspects of inventory Standardized containers reduce weight, disposal costs, wasted space, and labor

Pull system vs push system·Essentially JIT is a‘pull' concept wheredemand determines the flow.The traditional push system works whereproducts are manufactured or assembled inanticipation of demand and are positioned inthe supply chain as “buffers" betweenvarious functions

Pull system vs push system  Essentially JIT is a ‘pull’ concept where demand determines the flow.  The traditional push system works where products are manufactured or assembled in anticipation of demand and are positioned in the supply chain as “buffers” between various functions

PushSystemDefinition:Resources areprovidedtotheconsumerbasedonforecasts or schedules

共25页,试读已结束,阅读完整版请下载
刷新页面下载完整文档
VIP每日下载上限内不扣除下载券和下载次数;
按次数下载不扣除下载券;
注册用户24小时内重复下载只扣除一次;
顺序:VIP每日次数-->可用次数-->下载券;
相关文档