深圳大学:《塑料成型工艺与模具》课程教学资源(成型方案)Frame 2nd drawer MainMP_2-2

Model Reversion Client Slider qty Model Lifter qty Part name Frame, 2nd drawer Main, MP_2-2 Gate type Pin gate Part no 540634400A Cavities DEM by: WeiYong 2/3 Plate:3 plate
Model Reversion : A Client : Slider qty : 3 Model : Latte-2nd Lifter qty : 0 Part name : Frame,2nd drawer Main,MP_2-2 Gate type : Pin gate Part no.. : 54-06344-00A Cavities : 1 DFM by : WeiYong 2/3 Plate : 3 plate

ICAL I- Date of opening(all dates in 2036) ICAL 2- Date of beginning of action 3- Date foreseen for validation DFM follow-up issue. Integral Corrective Action List 4- Date of validation(closing) Page Open points Solutions /Action Who 2 4 P3 Gate(mold flow) Waiting for confirmation. 08/0908090809 P4 Parting line Waiting for confirmation. 08/0908090809 P5 Parting line Waiting for confirmation. 08/0908090809 P6 Parting line Waiting for confirmation. 080908/090809 .7 S ner Waiting for confirmation 080908090809 P8 Suggestion(others) Waiting for confirmation 08/0908090809 P9 Suggestion(others) Waiting for confirmation 080908090809 P10 Suggestion(others) Waiting for confirmation 08/0908090809 P1l Draft angle Waiting for confirmation 08/0908090809 P12 Draft angle Waiting for confirmation 08/0908090809 P13 Draft angle Waiting for confirmation 08/0908090809 p14 Draft angle Waiting for confirmation 08/0908090809 P15 Draft angle Waiting for confirmation 08/0908090809 P16 Draft angle Waiting for confirmation 08/09080908/09
ICAL ICAL 1 - Date of opening (all dates in 2036) 2 - Date of beginning of action 3.- Date foreseen for validation DFM follow-up issue. Integral Corrective Action List 4 – Date of validation (closing) Page Open points Solutions / Action Who 1 2 3 4 P.3 Gate (mold flow) Waiting for confirmation. 08/09 08/09 08/09 P.4 Parting line Waiting for confirmation. 08/09 08/09 08/09 P.5 Parting line Waiting for confirmation. 08/09 08/09 08/09 P.6 Parting line Waiting for confirmation. 08/09 08/09 08/09 P.7 Slider Waiting for confirmation 08/09 08/09 08/09 P.8 Suggestion (others) Waiting for confirmation 08/09 08/09 08/09 P.9 Suggestion (others) Waiting for confirmation 08/09 08/09 08/09 P.10 Suggestion (others) Waiting for confirmation 08/09 08/09 08/09 P.11 Draft angle Waiting for confirmation 08/09 08/09 08/09 P.12 Draft angle Waiting for confirmation 08/09 08/09 08/09 P.13 Draft angle Waiting for confirmation 08/09 08/09 08/09 P.14 Draft angle Waiting for confirmation 08/09 08/09 08/09 P.15 Draft angle Waiting for confirmation 08/09 08/09 08/09 P.16 Draft angle Waiting for confirmation 08/09 08/09 08/09

Gate(mold flow) 3 0后7 Four pin gate Reale口nm
Gate (mold flow) Four pin gate

Parting line cavity core
Parting line cavity core

Parting line cavIty core
Parting line cavity core

Parting line cav止t core
Parting line cavity core

Slider PLS add slider pins for preventing sticking in slider half
Slider Slider-3 PLS add slider pins for preventing sticking in slider half

Suggestion(others) THIS AREA NEED CUT PLASTIC BE FREE OF SINK MARK
Suggestion (others) THIS AREA NEED CUT PLASTIC BE FREE OF SINK MARK

Suggestion(others) THIS AREANEED CUT PLASTIC BE FREE OF SINK MARK
Suggestion (others) THIS AREA NEED CUT PLASTIC BE FREE OF SINK MARK

Suggestion(others) THIS AREA NEED CUT PLASTIC BE FREE OF SINK MARK
Suggestion (others) THIS AREA NEED CUT PLASTIC BE FREE OF SINK MARK
按次数下载不扣除下载券;
注册用户24小时内重复下载只扣除一次;
顺序:VIP每日次数-->可用次数-->下载券;
- 深圳大学:《塑料成型工艺与模具》课程教学资源(成型方案)mc192.ppt
- 《塑料成型工艺与模具》课程参考文献:柔性化多功能快速成型机的研制.pdf
- 《塑料成型工艺与模具》课程参考文献:应用Taguchi方法消除产品表面熔接痕的工艺研究.pdf
- 《塑料成型工艺与模具》课程参考文献:用灰关联分析法探讨金属材料性能参数对注塑模寿命的影响.pdf
- 《塑料成型工艺与模具》课程参考文献:SLS快速成形机软件系统的开发.pdf
- 《塑料成型工艺与模具》课程参考文献:对SLS覆膜砂制件抗压强度的研究.pdf
- 《塑料成型工艺与模具》课程参考文献:非量产模式下车间调度的改进遗传算法.pdf
- 《塑料成型工艺与模具》课程参考文献:非量产模式下基于约束加优先权值调度技术与算法.pdf
- 《塑料成型工艺与模具》课程参考文献:高光无痕注射成型工艺与装置.pdf
- 《塑料成型工艺与模具》课程参考文献:盒形塑件的几何构型与计算机充模流动模拟.pdf
- 《塑料成型工艺与模具》课程参考文献:基于解释器技术的模具工时计算研究.pdf
- 《塑料成型工艺与模具》课程参考文献:基于解释器技术的注塑模CAD系统研究.pdf
- 《塑料成型工艺与模具》课程参考文献:基于注射模规格参数的快速报价研究.pdf
- 《塑料成型工艺与模具》课程参考文献:基于实虚基因座的车间调度遗传算法.pdf
- 《塑料成型工艺与模具》课程参考文献:模具生产车间调度算法研究与实现.pdf
- 《塑料成型工艺与模具》课程参考文献:快速热冷注塑成型模温控制系统的研制.pdf
- 《塑料成型工艺与模具》课程参考文献:模具物料管理及自动排程系统研制.pdf
- 《塑料成型工艺与模具》课程参考文献:模具制造信息化系统的构建.pdf
- 《塑料成型工艺与模具》课程参考文献:模具制造估报价系统.pdf
- 《塑料成型工艺与模具》课程参考文献:3DM参数化设计系统构建语言.pdf
- 深圳大学:《塑料成型工艺与模具》课程教学资源(成型方案)GUIDE-2NDINPUTTRAYRIGHT-MP.ppt
- 深圳大学:《塑料成型工艺与模具》课程教学资源(成型方案)849b064070-BRACKET HOLDER DUP.ppt
- 深圳大学:《塑料成型工艺与模具》课程教学资源(成型方案)849b069970-Plate bottom a4.ppt
- 深圳大学:《塑料成型工艺与模具》课程教学资源(成型方案)849b64080_k001.ppt
- 深圳大学:《塑料成型工艺与模具》课程教学资源(成型方案)DELL_C9415-dfm-0829_b1.ppt
- 深圳大学:《塑料成型工艺与模具》课程教学资源(成型方案)802b089460_k001-COVER CONECT DUP.ppt
- 深圳大学:《塑料成型工艺与模具》课程教学资源(成型方案)802b089470_k001-COVER PWBA DUP.ppt
- 深圳大学:《塑料成型工艺与模具》课程教学资源(成型方案)802b089810_cover_fuser.ppt
- 深圳大学:《塑料成型工艺与模具》课程教学资源(成型方案)802b091520_k001-Cover receptacle.ppt
- 深圳大学:《塑料成型工艺与模具》课程教学资源(成型方案)802b091610_k001-Cover harness.ppt
- 深圳大学:《塑料成型工艺与模具》课程教学资源(成型方案)802b086500_k001-Cover under r.ppt
- 深圳大学:《塑料成型工艺与模具》课程教学资源(成型方案)802b088910-Housing plate.ppt
- 深圳大学:《塑料成型工艺与模具》课程教学资源(成型方案)802b088920_k001-Housing drv ph.ppt
- 深圳大学:《塑料成型工艺与模具》课程教学资源(成型方案)802b089270_k001-hsg_base_fr_250.ppt
- 深圳大学:《塑料成型工艺与模具》课程教学资源(成型方案)802b089290_k001-Cover SNR.ppt
- 深圳大学:《塑料成型工艺与模具》课程教学资源(成型方案)802b86510_cover_rear.ppt
- 深圳大学:《塑料成型工艺与模具》课程教学资源(成型方案)054b029640-CHUTE GATE.ppt
- 深圳大学:《塑料成型工艺与模具》课程教学资源(成型方案)059b02320-ROLL PINCH TURN.ppt
- 深圳大学:《塑料成型工艺与模具》课程教学资源(成型方案)120b026950_k001-ACTUATOR NO PAPER A4.ppt
- 深圳大学:《塑料成型工艺与模具》课程教学资源(成型方案)120b026960-ACTUATOR A.ppt